Wednesday, January 9, 2008

Journal Entry 5

Today's start was a little slow. We started off at 10am. We were supposed to meet in the studio at 9am but Davina and Mike were a little late. We all went to the construction site of highway 64-40. After the setting up all the equipments, we started shooting the B-rolls and NAT sounds. Then Dan Galvin from Gateway Constructions came and we had a small introduction with him. He told us that since it is very hard to drive on the highway right now due to the construction, he can only squeeze in two people maximum. So Michael and Davina went to do the interview with him since Haley and I, we both did not know how to run the camera. Haley and I just waited for them to come back and had a good time talking about each other. After they came back we shot the stand ups of haley and I since Davina and Mike shot theirs at the construction site only. After we were done with all the shooting stuff, we drove around to find a random person who lives around and uses highway 64-40 to interview. After asking to about five people, we finally found a lady to do our second interview. After that we packed up all of our equipments to make sure we reach campus soon so that we can write our logs. Later since we all were hungry we went to subway to get something to eat. We came back to the studio to log it and at last we all were glad to be done for the day.

No comments: